TB3 SeriesIncluding: TB3; TB3-LP; TB3Q; TB3Q-LPSTARTING WITH SERIAL NUMBER: TU000200000INSTALLATION & OPERATING MANUALBUNN-O-MATIC CORPORATIONPOST
Page 1041465 082208OPERATING CONTROLSA. ON/OFF SwitchON - Placing the switch in the left position allows the start switch to activate a timed brew c
Page 1141465 082208CLEANINGCAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY1. Remove and thoroughly clean the entire brew funnel. The funnel
Page 2BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) All equipment other than
Page 3WARNING !Fill water tank before turning - on - thermostat or connecting appliance to power source. Use only on a properly protected circuit cap
Page 4ELECTRICAL REQUIREMENTSCAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.120V model brewers requi
Page 5120V MODELSThese brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a ½˝ or
Page 6o oo oADJUSTING BREW VOLUMESNOTE: Check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in
Page 7INITIAL SET-UP (TB3Q/TB3Q-LP ONLY)CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when spe
Page 8INITIAL SET-UP (TB3/TB3-LP ONLY)CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when speci
Page 9AUTO SWEETENER SET-UPCAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the
Kommentare zu diesen Handbüchern