Bunn Dual TF BrewWISE DBC Anleitung zur Fehlerbehebung

Stöbern Sie online oder laden Sie Anleitung zur Fehlerbehebung nach Kaffeemacher Bunn Dual TF BrewWISE DBC herunter. Bunn Dual TF BrewWISE DBC Troubleshooting guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - TECHNICAL TRAINING

BUNN® TECHNICAL TRAININGThermoFresh BrewWISE® DBC

Seite 2

TF BrewWISE® Training Manual10 Enter new number for each bypass valve, after doing CALIBRATE FLOW and measuring output. Enter n

Seite 3 - Unit 1 installation

Bunn-O-Matic Corporation11LEFT OZ 36.0QUIT YESCALIBRATE FLOW ?NO YESSPRAY HEAD CAL ?NO YESStep4:Toactivatetheowratecheck,presst

Seite 4 - Installation

TF BrewWISE® Training Manual12Calibrating the Temperature Sensing ProbeNote: Calibrating the temperature sensing probe (thermistor) should be done whe

Seite 5 - Electrical Install

Unit ObjectivesUnit 3 Machine coMpositionGiven a realistic scenario in which the learner has access to the machine’s internal components the learner

Seite 6

TF BrewWISE® Training Manual14Machine CompositionExterior OverviewProduct Outlets and Removable Parts• User interface (1)• Display (mounted to the c

Seite 7 - Unit 2 setup

Bunn-O-Matic Corporation15Machine Function and OperationsMain Control BoardThe main control board is the brain of the brewer. In the Digital Brewer Co

Seite 8 - Setup and Programming

TF BrewWISE® Training Manual16Heating SystemThe heating system consists of:• Water tank• Heating elements• Triacs• Contactor (3 phase only)• High

Seite 9 - Level 2 Programming

Bunn-O-Matic Corporation17Dispensing SystemThe dispensing system consists of:• Brew valve• Bypass valve• Sprayhead• Funnel• Funnel lock solenoids

Seite 10 - Level 3 Programming

Unit ObjectivesUnit 4 preventive MaintenanceGiven a realistic scenario depicting a machine requiring a preventive maintenance, the learner will be ab

Seite 11 - Today’s S pecial

Bunn-O-Matic Corporation19Preventive MaintenanceIn order to maintain proper operation and long service life BUNN recommends performing the preventive

Seite 12 - (-) (+)DONE

IndexUnit 1: Installation Site Requirements ...

Seite 13 - Unit 3 Machine coMposition

TF BrewWISE® Training Manual20 □ Clean any mineral build-up from the valve □ Reassembly is the opposite of disassemblyStep6:Cleanthetankttingst

Seite 14 - Brew Start Switch

Unit ObjectivesUnit 5 troubleshootingGiven a realistic scenario depicting a broken machine, the learner will be able to effectively troubleshoot, dia

Seite 15 - Bunn-O-Matic Corporation

TF BrewWISE® Training Manual22Troubleshooting and RepairService ToolsThe BrewWISE® brewer features on-board troubleshooting. Since all of the machine’

Seite 16 - Training Manual

Bunn-O-Matic Corporation23Test SwitchesPress any of the input buttons on the membrane switch, the display will show which button is being pressed.Test

Seite 17 - Sprayhead

TF BrewWISE® Training Manual24Operator Fault MessagesThe following fault messages will appear on the display if the operator needs to take corrective

Seite 18 - Unit Objectives

Bunn-O-Matic Corporation25Equipment will not operate. 1. No power or incorrect volt-age.Measure the voltage at the terminal blockandconrmthatitm

Seite 19 - Preventive Maintenance

TF BrewWISE® Training Manual26Water will not heat or display shows HEAT-ING TIME TOO LONG, (Cont.)2. Tank Heaters Remove power from the brewer. Check

Seite 20

Bunn-O-Matic Corporation27Inconsistent beverage level in server. (Cont.)3. brew valve Test the Brew Valve. Turn the valve on for 30 seconds and collec

Seite 21 - Unit 5 troubleshooting

TF BrewWISE® Training Manual28Weak beverage. (Cont.) 5. Water temperature Empty the server, remove its cover, and place the server beneath the sprayhe

Seite 22 - Troubleshooting and Repair

Bunn-O-Matic Corporation29Triac Map1. Left Funnel Lock2. Right Funnel Lock3. Left Transformer4. Left Dispense Valve5. Right Dispense Valve6. Left Bypa

Seite 23 - Service Fault Messages

Unit ObjectivesUnit 1 installationGiven a realistic scenario depicting a new site install, the learner will be able to install and setup the brewer f

Seite 24 - 1-800-286-6345

Unit Objectives©Bunn-O-Matic Corporation, 2011. All rights reserved. Bunn-O-MaticCorporation-1400StevensonDrive- Springeld,IL627

Seite 26

TF BrewWISE® Training Manual4InstallationSite RequirementsSpace• Single TF BrewWISE - Counter able to support the weight of the machine, approximate

Seite 27

Bunn-O-Matic Corporation5Electrical InstallRefer to the electrical section of the machine’s data plate to select the proper power cord, plug and recep

Seite 28

TF BrewWISE® Training Manual6Units without a NeutralTheeld-switchableDualswillhaveaninternalstep-downtransformeranda2-polecontactorinad

Seite 29 - Triac Map

Unit ObjectivesUnit 2 setupGiven a realistic scenario depicting a new site install, the learner will be able to install and setup the brewer for cust

Seite 30 - Additional Resources

TF BrewWISE® Training Manual8Setup and ProgrammingThe BrewWISE® software is the latest evolution of BUNN’s digital brewer control (DBC®) system. The s

Seite 31

Bunn-O-Matic Corporation9Level 1 ProgrammingPress and hold the right hidden switch until the display screen reads “Brew Lockout?” and release. This

Kommentare zu diesen Handbüchern

Keine Kommentare