INSTALLATION & OPERATING GUIDEBUNN-O-MATIC CORPORATION POST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217) 529-6601 FAX: (217) 529
Page 2INTRODUCTIONThis brewer incorporates a wireless interface system that allows the DBC Grinder to load certain information into the "programm
Page 300656.000100658.000020201.5600USER NOTICESThe notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.378
Page 4ELECTRICAL HOOK-UP (Models without power cord)CAUTION – Improper electrical installation will damage electronic components. Damage caused by inc
Page 5CE REQUIREMENTS• This appliance must be installed in locations where it can be overseen by trained personnel.• For proper operation, this applia
Page 6OPERATING CONTROLS OPERATING CONTROLS(a) MAIN ON/OFF SWITCH This switch, located under the brewer behind the right front leg, turns power on an
Page 7INITIAL SETUPCAUTION: The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructio
Page 8SET READY - Range: 185˚F (85˚C) to 203˚F (95˚C) This function allows the operator to set the minimum temperature allowable to start a brew cycl
Page 9CLEANING1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic e
Kommentare zu diesen Handbüchern