
Page 7
35879 042205
INITIAL SETUP
CAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails of the brew station.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled
to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water.
4. Wait approximately 20 mins for the water in the tank to heat to the proper temperature on 120V/208V machines.
(Wait approximately 45 mins on 120V machines). Display will show READY TO BREW...WATER TEMP: XXX˚
when tank is at operating temperature.
5. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling.
6. Water volumes have been preset at the factory. Refer to adjustments for the
Set Brew Volumes
section of this
manual should the volume need to be increased or decreased.
7. The brewer is now ready for use in accordance with the coffee brewing instructions.
COFFEE BREWING
1. Select the desired batch size on the grinder. It is not necessary to select a size on the brewer.
2. Insert a BUNN
®
filter into the funnel.
3. Grind the selected amount of fresh coffee into the Smart Funnel
®
using the G9-2T DBC with Smart Funnel
®
operation and level the grounds by gently shaking.
4. Slide the funnel into the funnel rails. The brewer will read the size ground through the chip in the funnel handle
and will automatically select the correct size to brew. If the grounds are not obtained through a grinder
compatible with a Smart Funnel
®
, a batch size must be chosen on the brewer.
5. Place an empty server under the funnel.
6 The must be ON (indicator lit). Momentarily press and release the pad. If the brewer has the funnel
lock option and if it is activated, once a brew cycle has been started the funnel is locked in place. There may
be certain situations in which the brew cycle will not begin when is pressed:
a) ON/OFF must be ON (indicator lit).
b) BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option. (Page 10)
c) FUNNEL NOT IN PLACE (or using a standard brew funnel) - cancel FUNNEL DETECT. (Page 30)
d) CHECK FUNNEL - remove funnel, empty previously brewed grounds and grind a new batch into the funnel.
7. If none of the above messages are displayed, the display will read NOW BREWING and the time remaining in
the brew cycle.
8. Following the BREW will be a countdown of drip time DRIPPING which shows the time remaining until the
funnel lock will release. Discard the grounds and filter only after visible dripping stops.
Kommentare zu diesen Handbüchern